based in Southern California

Beam and Plate Lagging

United Airlines

This project involved the installation of a beam and plate pit using the ABI Mobilram system. The shoring consisted of 40-foot beams and 12-foot plates, providing structural support for a Drainage Retention System.

Construction site with geotextile and drilling rig
Zefiro logo
Work With Zefiro

Copyright © 2025 – Zefiro  |  Terms and conditions  |  Privacy Policy

Zefiro logo

Copyright © 2026 – Zefiro  |  Terms and conditions  |  Privacy Policy