based in Southern California
Beam and Plate Lagging
Emergency Release Facility
This project involved installing a temporary shoring wall using our Soilmec SR45 in challenging wet and hard ground conditions. The shoring system provided critical support to an existing roadway, enabling safe excavation and relocation of utilities.
