Giken UP150/HVR100

Shaft 4

This project required installing a sheet pile shaft beneath an existing bridge with just 23 feet of overhead clearance, making access extremely limited. Our crew spliced and installed 35-foot sheet piles using the Giken UP150 and HVR100, specifically selected for their ability to operate in tight, low-clearance conditions. The shaft was needed to block groundwater and provide access to an existing sewer line 20 feet below grade.