Emergency Release Facility

based in Southern California Beam and Plate Lagging Emergency Release Facility This project involved installing a temporary shoring wall using our Soilmec SR45 in challenging wet and hard ground conditions. The shoring system provided critical support to an existing roadway, enabling safe excavation and relocation of utilities.

MPC

based in Southern California Limited Access MPC For this project, we utilized a limited-access drilling rig to install temporary beam and plate shoring for a new utility line. The work area presented significant constraints, including only 15 feet of overhead clearance beneath an existing bridge and wet ground conditions, requiring specialized equipment and beam splicing to successfully complete the installation.

North Hollywood

based in Southern California Tiebacks North Hollywood This project involved installing a shoring system to support an existing vault prior to the construction of a new groundwater remediation facility. The system utilized beam and wood lagging with tiebacks to ensure stability during adjacent excavation and construction activities.

United Airlines

based in Southern California Beam and Plate Lagging United Airlines This project involved the installation of a beam and plate pit using the ABI Mobilram system. The shoring consisted of 40-foot beams and 12-foot plates, providing structural support for a Drainage Retention System.

Work With Zefiro

Copyright © 2025 – Zefiro  |  Terms and conditions  |  Privacy Policy

Copyright © 2026 – Zefiro  |  Terms and conditions  |  Privacy Policy