Giken UP150/HVR100

Shaft 4

This project required installing a sheet pile shaft beneath an existing bridge with just 23 feet of overhead clearance, making access extremely limited. Our crew spliced and installed 35-foot sheet piles using the Giken UP150 and HVR100, specifically selected for their ability to operate in tight, low-clearance conditions. The shaft was needed to block groundwater and provide access to an existing sewer line 20 feet below grade.

Construction workers in excavated pit under overpass
Construction workers operating excavator under highway overpass