This project involved installing two permanent sheet pile walls around a live sewer line to protect it while providing access for the installation of two new adjacent lines. Because the existing line was active, a vibration-free method was critical. Our team used the ABI Press-In Method to safely install 30-foot sheets with zero vibration, maintaining the integrity of the live line throughout the operation.